South Entrance Temporarily Closing for Repaving Work

The final phase of the summer paving project kicks off on Wednesday, July 17, when the South Entrance to campus (access from May Street) will close temporarily while the south parking area (Lot D) is repaved and striped. Weather permitting, this final phase is scheduled to conclude by mid-August.

The front parking lot (Lot P) and roadway will also be closed for the duration of this repaving. All employees and visitors will be required to enter campus through North Entrance (Lot O).

The roadway between the Wellness Center and Coughlin Field, in addition to the Wasylean Hall parking lot (Lot B), will re-open on Tuesday, July 16. 

To access the parking garage, which will remain open, employees and visitors will travel up the roadway between Lake Ellie and the Student Center and bear left in front of Sheehan Hall (temporarily changed to a two-way street), through the Wasylean Hall parking lot to the second-floor entrance to the garage.